englischFrom a legal perspective, connecting offshore wind parks to onshore electric grids is one of the central problem areas of offshore wind energy. Given the technical and economic challenges of offshore wind energy extension, interests of all participants are to be aligned through the amendment of §§ 17 a ff. EnWG. The focus of this work will be to clarify the concrete code of duties for transmission network operators vis-a-vis offshore wind park operators, to define the limits of the duty of cable installation, and to specify the legal consequences of violating this duty. Special focus will be on the right for compensation claims of wind park operators in § 17 e Abs. 2 EnWG. The work combines the status quo of the current jurisdiction and literature with the authors own further legal argumentation.
Die Netzanbindung von Windanlagen auf See an das Stromnetz an Land stellt aus rechtlicher Sicht eine der zentralen Problemfelder der Offshore-Windenergie dar. Vor dem Hintergrund der technischen und ökonomischen Herausforderungen bei dem Ausbau der Windenergie auf See sollen die novellierten §§ 17 a ff. EnWG die Interessen der Beteiligten in einen angemessenen Ausgleich bringen. Der Schwerpunkt des Werkes liegt darauf, den genauen Pflichtenkatalog der Übertragungsnetzbetreiber gegenüber den Betreibern der Windanlagen auf See herauszuarbeiten und im Anschluss die Grenzen der Pflicht zur Leitungserrichtung und die Rechtsfolgen bei einer Pflichtverletzung aufzuzeigen. Der Darstellung des Entschädigungsanspruchs der Windparkbetreiber in § 17 e Abs. 2 EnWG kommt hierbei besondere Bedeutung. Die Verfasserin treibt die Diskussion in Rechtsprechung und Literatur zu dem hochaktuellen Thema durch eine Vielzahl an Denkanstößen und weiterführende wissenschaftliche Argumentation voran.